During the pre-construction phase of the Fremont Building, Delta Plumbing worked closely with our management team and successful value engineered the project which included redesigning the water distribution and sewer systems and securing approval from the building department and mechanical engineer. The result was a substantial reduction in the contract price without compromising quality or performance.
The execution of the work was performed in a highly productive manner with a strong emphasis on quality and cooperation. I would recommend Delta Plumbing Contractors to anyone looking for a capable and professional plumbing company.
— Bill Fillios, CNM Construction
